call us now: +44 (0) 1403 741166

Advantages of the Helical (screw) pile

GTL’s Helical (screw) pile foundation is predominantly known for its ease and speed of installation.

Some of the advantages are: (please click on one for more information)

  • Speed of installation...
    typically a standard 6m pile takes on average ten minutes to install. This reduces contract program time, on site prelims, speed to market and road/track closures and operational downtime amongst other factors.
  • Sustainable and environmentally friendly...
    by reversing the installation process the Helical (screw) pile can be decommissioned and re-used leaving a Greenfield site. The product can also be recycled.
  • No spoil...
    with the spiraling cost of muck away the solution proves to be financially and environmentally viable especially in contaminated ground.
  • No Concrete...
    no curing time so loads can be applied immediately. A 60m mast foundation can be installed within one day.
  • Less disruption...
    Reduced deliveries unlike the wet trades, means less disruption to neighbours and other on site activities.
  • Workmanship...
    not so reliant on skill of driver. Minimum Instruments required monitoring pile installation thus reducing errors and problems of calibration.
  • Waste...
    minimal materials wasted. Waste can be recycled. Off site pre-fabrication of piles and grillages reduces site waste and disposal costs.
  • Program acceleration...
    If program requires acceleration then this can be achieved quickly by deploying additional installation equipment and materials.
  • Minimal Soil Disturbance...
    due to installation method unlike CFA or Rotary Bored. Especially through sand and gravels.
  • Reduced Negative Skin Friction...
    Helical piles have an advantage in providing reduced negative skin friction in soft clays, as the stem diameter is smaller than the flight diameter. This gives a larger pile capacity compared with other pile systems.
  • Adaptable...
    Pile can be tailored to suit the ground conditions from cohesive (clays) to cohesionless (sands and gravels) soils or a combination of both.
  • Reduced resource...
    a typical crew consists of three. An advantage on hazardous sites where mitigating risk is paramount. It also allows GTL to provide up to 85% national content.
  • Guaranteed product...
    quality control of steel and fabrication gives confidence in the quality of the pile in the ground prior to installation.
  • End Bearing...
    the steel helix plate gives you very good end bearing characteristics, with very little re-moulding of the soil surface due to installation.
  • Flexible...
    Helix plates can be spaced to give particular failure conditions (end bearing or shaft).
  • Comparable...
    Monitoring of soils quality and capacity via torque transducer during installation, provides a direct comparison to available site investigation and preliminary pile tests.
  • Soil variability - ...
    Unforeseen variability in soils can be overcome by the addition of helical plates and pile sections.
  • Quick test results...
    Preliminary Pile tests and results can be carried out and received with 48 hours of starting test setup.
  • On site Modifications...
    Variability in penetration depth is achieved by additional pile sections.
  • Reinforcement cages...
    do not require reinforcement cages which eliminates the inherit associated problems.
  • Close proximity...
    to trees, services, existing foundations and buildings. No root damage or undermining.
  • Resistance to tension and compression...
    the pile can be used as a tension anchor and soil nail.
  • Restricted access...
    Segmented sections for reduced head heights – piles can be installed under pipe racks and in basements.
  • Cold temperature conditions...
    unlike concrete that can only be installed above freezing point without specialist equipment.
  • Underwater Installation...
    by utilising specialist GTL equipment Helical (screw) piles are able to be installed in subsea marine conditions
  • Low mobilisation/demobilistation costs...
    equipment is delivered by a low loader
  • Corrosion...
    within aggressive soils can be accommodated
  • No liners/casings...
    no requirement for piling through perched water tables or underground water courses.
  • Defects...
    as concrete is not being used, the risk of inherent defects caused by necking (e.g. high ground water table ground conditions) or bulging is eliminated
  • Integrity - ...
    No integrity testing is required
  • Obstructions/Services...
    If obstructions in ground occur (e.g. Fill) unlike other piling systems, screw piles can be removed and reinserted again